![surpac block model display elevations surpac block model display elevations](https://i.ytimg.com/vi/Z5Qj3Ujz1fo/maxresdefault.jpg)
#SURPAC BLOCK MODEL DISPLAY ELEVATIONS SOFTWARE#
Apply Surpac software to visualize mining engineering in open pit. Beijing: Surpac Software International, 2002. An approach to computer modeling and visualization of geological faults in 3D. Three dimensional modeling and application in geological exploration engineering. Research of the vein lead-zinc deposit modeling method.
![surpac block model display elevations surpac block model display elevations](https://image.slidesharecdn.com/blockmodelingusingsurpac-191229054352/95/block-modeling-using-surpac-24-638.jpg)
The application of deposit 3D model based on micromine. They can be used to assist the geologic and mining engineers of the mine to do research work of reserves estimation, mining design, plan making and so on.ĬHEN Ai-bing, QIN De-xin, ZHANG Xue-shu. Obviously, the built models are reliable and the calculated results of reserves are correct. The absolute errors of Sn, Pb, and Zn reserves are only 1.45%, 1.59% and 1.62%, respectively.
![surpac block model display elevations surpac block model display elevations](https://ars.els-cdn.com/content/image/1-s2.0-S1365160918312474-fx1.jpg)
Finally, the calculated result of each metal reserve to its actual prospecting reserve was compared, and the results show that they are all almost equal to each other. Then, the reserve of each metal element and every sublevel of the mine was worked out. In order to compute the reserves, a grade block model was built and each metal element grade was estimated using Ordinary Kriging. By the aid of the international mining software SURPAC, a geologic database for a multi-metal mine was established, 3D models of the surface, geologic fault, ore body, cavity and the underground openings were built, and the volume of the cavity of the mine based on the cavity 3D model was calculated.